Pipeline Construction Equipment

View as List Grid

Items 1-10 of 35

Set Descending Direction
    ?>
  1. Bending Die Set – Heavy Duty Pipe Bending Tooling Set for Accurate Radius Bends, High Strength Steel Dies, Smooth Finish, Long Service Life, Ideal for Fabrication & Pipeline Work
    AED 9,629.30 - AED 403,813.71
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
  2. ?>
  3. Plug Mandrel – Precision Pipe Bending Plug Mandrel for Internal Support, Prevents Ovality & Wrinkles, High Strength Alloy Steel, Perfect for Smooth Bends in Workshop & Site Jobs
    AED 19,258.59 - AED 47,127.92
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
  4. ?>
  5. Hydraulic Wedge Mandrel (Non Powered) – Non Powered Wedge Mandrel for Pipe Bending Support, Durable Heavy Duty Build, Improves Forming Accuracy, Reduces Deformation During Bending
    AED 29,901.35 - AED 63,351.56
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
  6. ?>
  7. Hydraulic Wedge Mandrel (Powered) – Powered Hydraulic Wedge Mandrel for Heavy Duty Pipe Bending, Better Control & Consistency, High Strength Construction, Reliable Tool for Production Bends
    AED 63,351.56 - AED 257,189.15
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
  8. ?>
  9. External Heating Torch – Industrial External Heating Torch for Pipe Preheating & Bending Assistance, High Heat Output, Rugged Long Life Design, Suitable for Fabrication Yard and Field Work
    AED 1,322.10 - AED 7,859.15
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
  10. ?>
  11. Internal Heating Torch – Internal Pipe Heating Torch for Controlled Uniform Heating, Improves Bending Quality, High Temperature Performance, Durable Design for Pipeline Fabrication & Workshop Use
    AED 1,013.61 - AED 6,945.20
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
  12. ?>
  13. Pneumatic Internal Line Up Clamp (Non Self) – Pneumatic Internal Line-Up Clamp Non Self Centering for Fast Pipe Fit-Up, Strong Holding Force, Improves Welding Alignment for Pipeline Projects
    AED 25,846.61 - AED 55,747.05
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
  14. ?>
  15. Pneumatic Internal Line Up Clamp (Self) – Self Centering Pneumatic Internal Line-Up Clamp for Quick Pipe Alignment, High Clamping Force, Accurate Fit-Up, Ideal for Pipeline Welding and Fabrication
    AED 55,747.05 - AED 229,083.36
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
  16. ?>
  17. Pneumatic Internal Line Up Clamp (Copper Backup) – Pneumatic Internal Clamp with Copper Backup for Welding Support, Prevents Burn Through, Strong Alignment, Reliable Fit-Up for Pipeline Welding Work
    AED 70,448.00 - AED 358,859.84
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
  18. ?>
  19. Hydraulic Internal Line Up Clamp (Non Self) – Hydraulic Internal Line-Up Clamp Non Self Centering for Heavy Duty Pipe Fit-Up, High Holding Force, Accurate Alignment, Ideal for Pipeline Welding Sites
    AED 6,438.93 - AED 19,764.65
    Min Order: 1 Piece
    Est. Delivery by May 9
    Place of Origin: India
Page
per page
© 2026 Kobray. - All Rights Reserved